Archives Complete
Document [PDF 528KB]
Summary of
Delegation of Authority to WHO Representatives in the SEA Region by the
Regional Director effective 1 August
2008 (Cumulative revision of 1 May 2006 version)
This Delegation of Authority cancels and supersedes all
previous delegations of authority. Additional delegations are also stated in
the WHO Manual. In case of conflict, the provisions in this Delegation of
Authority shall prevail over Manual provisions. There is a separate set of
provisions on delegation of authority in case of emergencies as elaborated in Standard Operating Procedures for Emergencies (http://intranet.who.int/homes/hac/sop/
)
I. PROGRAMME
i. The framework for WR's delegated authority is provided through the
Organization's result-based management concepts and the biennial Workplan. Once the Workplan has
been approved by the Regional Director, the Products and Activities under the
Workplan provide the WR
with the authority to implement WHO's collaborative
programme with the country.
II. PROGRAMME
CHANGES
i. WRs
are authorized to create new activities in the country workplans
as long as these are related to achieving the Products and OSERs (Office Specific Expected Results) within the same workplan.
ii. WRs are authorized to move
allotted funds between products within the same OWER
(Organization-wide Expected Results) in a Strategic Objective.
iii. However, following programme changes will require
approval from the Regional Office (DRD, DPM or DAF, as appropriate):
Creating new products in an OSER
Moving funds from one OWER
to another in the same Strategic Objective
Shifting funds from one Strategic Objectives
to another or increasing the budgeted amount in a Strategic Objective
No funds can be shifted from staffing
provisions (LTS) or general operating expenses (GOE) without DAF’s prior
approval.
Any additions/deletions to HR Plan or change
in planned costs need approval of Regional Office (DRD,
DPM, DAF, as appropriate).
iv. All Programme changes requiring approvals in the
Regional Office are to be forwarded to PPC Unit in
SEARO for further processing.
v. DRD, DPM
and DAF would exercise judgment in deciding on what needs to be brought to RD's attention in this regard.
III. DUTY TRAVEL
i. WRs
are authorized to approve travel within the country of assignment as well as
international travel within the South-East Asia Region for all staff under
their direct supervision, on the understanding that such travel is only
undertaken when agreement has been obtained from the WR
in the country of destination and if necessary, the national authorities
concerned. In order to ensure inter-regional coordination, any duty travel
outside SEAR needs approval
of DRD/DPM/DAF as the case may be.
ii. Travel by WR outside the
country of their assignment will need to be referred to DRD/DPM/DAF
for clearance as the case may be according to the purpose of travel and RD
for prior approval. Travels within the country of assignment can be managed
through blanket approvals by RD at the beginning of the year, instead of
requesting approval for each case.
iii. WRs are also authorized to
approve travel of nationals in relation to WHO activities within and outside
the Region.
iv. Within the prescribed guidelines in WHO Manual , WRs are authorized to approve excess baggage up to 10 Kgs
for travels of WHO staff under WR’s authority for
approval. Beyond 10 Kgs it should be referred to
DAF for approval.
IV. MONETARY LIMITS
Notwithstanding the basic delegation outlined above, the
following monetary limits will apply to WRs'
delegated authority:
a. Agreement for
Performance of Work (APW)
(WHO Manual Provision VI. 7.190-245) US$50,000
i. Country-based Contract Review
Committee (CRC) should review the proposal for APW, if deemed necessary by the WR.
ii. A justification for any advance payment is always
required. The amount of initial payment on signature should normally not
exceed 25% of the total contract amount. If an initial payment of more than
25% is required, full justification must be sent to DAF/SEARO for decision.
b. Direct Financial
Cooperation (DFC)
[formerly Local Cost Subsidies]
(WHO Manual IV. 1. 170•240) US$50,000
i. As with LCS,
Direct Financial Cooperation (DFC) is used to cover
the costs of items that would otherwise be borne by governments, in order to
strengthen their health development capacity and ability to participate in
WHO technical cooperation at country level. Government requests for DFC must be part of an approved workplan.
ii. WRs’ authority in this
regard does not apply to Government requests for salary subsidies, which is
not delegated.
iii. WRs should also ensure that
the total DFC requests under Assessed Contribution
do not exceed 15% of the overall country planned budget.
iv. DRD or DPM
will be the signatory on agreements beyond the WRs'
delegated authority. Prior to signatures by DRD or DPM:
DFC over US$ 200,000
needs DAF’s review;
RD's approval is
needed if the DFC is beyond US$ 500,000.
v. Full advances are allowed for one time activities of a
short duration (3 months); otherwise payments are to be made in instalments as specified in the agreement with initial
advance not exceeding 80%. Further advances/ instalments
must be withheld from contractual partners when reports and Statements of
Expenditures (SoE) are overdue.
vi. WCO should maintain and
monitor status of DFC advances, outstanding
Statement of Expenditure (SOEs) and overdue cases.
Quarterly status of outstanding/overdue DFC
advances should be sent to BFO in the standard
format.
c. Technical
Service Agreements (TSAs)
(WHO Manual XII.3) US$50,000
i. WRs
are authorized to conclude TSAs up to the amount
specified above in respect of provisions made in the approved country workplans.
ii. The amount of initial payment on signature should
normally not exceed 25% of the total contract amount. If an initial payment
of more than 25% is required, full justification must be sent to HSD/SEARO for decision.
d. Supplies &
Equipment
(WHO Manual VI.9)
US$50,000 (Tier 1)
US$25,000
(Tier 2)
Tier 1 Countries: BAN, DPRK, IND,
INO, MMR
Tier 2 Countries: BHU,
MAV, NEP, SRL, THA, TLS
i. WRs
are authorized to incur expenditures for local procurement per individual
Purchase Order up to the level indicated above, provided that quotations are
invited from at least 3 suppliers, whenever the cost of a single purchase of
goods and services exceeds US$ 1,000.
ii. If competitive bidding is not practical for various
reasons, an Adjudication Report must be prepared in accordance with Manual
provisions VI.1.320-330.
iii. With increase in monetary limits for procurement, it
is essential to strengthen controls in this sensitive area. Therefore, all
proposals above US$5,000 must be submitted to country-based CRC2.
V. HUMAN
RESOURCES (Selection and Appointment)
The following delegation of authorities
relate to selection and appointment of staff as per prevailing policy
guidelines.
a. Fixed-term
Professional Staff (P Staff)
i. Selection of ‘P’ staff will
be retained at the Regional Office, but WR may
participate as member of the Selection Panel for all such posts in his/her
respective country.
b. Fixed-term
National Professional Officers (NPOs)
i. WRs
are authorized to recruit staff for fixed-term NPO
posts; the final formal approval will be accorded by RD. Based on selection
documents, PER/SEARO will issue the offer of appointment in all cases.
c. Fixed-term
General Service Staff (GS staff)
i. WRs
are authorized to recruit staff against vacancies for GS posts in the country
office, irrespective of grade but subject to detailed guidelines from
PER/SEARO. Final approving authority will, however, be DRD/DPM/DAF
and RD as the case may be. (IC-2007-33
refers). Based on the selection documents, PER/SEARO will issue the offer of
appointment in all cases.
d. Temporary
International Professional (TIP)
i. WRs
are authorized to recruit TIPs up to six months or
less under Staff Rule 420.4 against a temporary function of the Country
Office for activities included in the approved workplans/HR
Plan (including activities where original plan did not envisage hiring TIP)
or against any vacant post.
ii. Recruitment of TlPs under WRs' delegated authority should be undertaken in
consultation with the concerned technical units and Directors in SEARO.
iii. Any TIP contract of more than six months or
extension/renewal beyond the initial six months (with or without contract
break) should be referred to PER/SEARO for review and further approval by RD
through DRD/DPM or DAF as the case may be. Such
appointments should be either advertised or selection made through a formal roster maintained by relevant technical department (IC-2007-37 and IC-2008-10
[Rev.1] refer).
iv. Personnel Payroll Information System (PPIS) should be used by all country offices in the
processing of TIP recruitment until GSM goes live.
e. Consultants
[former Short Term Consultants (STC)]
i. WRs
are authorized to recruit Consultants in place of TIPs
up to six weeks in case of emergency need, epidemic control, disease
outbreak, with justification for cost increase. Consultant should not be
recruited against any existing vacant post.
ii. WRs are authorized to
appoint consultants with remuneration as per band A&B
only and at band C for
only the minimum limit (US$ 450) as defined in IC-2008-25.
iii. Any recruitment beyond this delegated authority needs
RD’s approval through DRD/DPM/DAF
as the case may be.
f. Temporary
National Professional Staff (TNP)/ Temporary GS
Staff (TGS) under Staff Rule 420.4
i. WRs
are authorized to select and recruit TNP/TGS up to
24 months under staff Rule 420.4 against a temporary function in the country
offices for activities included in the approved workplans/HR
Plan (including activities where original plan did not envisage hiring TNP/TGS) or against any vacant post.
ii. Temporary appointments of more than six months'
duration should be made through advertisement or through a formal roster
established by WHO Country Office for generic categories of job according to
the guidelines to be provided by PER/SEARO.
iii. When recruitment takes place through advertisement or
through established roster, subsequent temporary appointments may be offered
without re-advertising, provided all the following conditions are met:
terms of reference remain substantially the
same
the grade level is unchanged,
subject to satisfactory performance
up to maximum duration of temporary
appointments and temporary function and bearing in mind that the total
duration of uninterrupted services under consecutive temporary appointments
does not exceed two years.
Any requests for deviations should be submitted through DRD/DPM/DAF (as the case may be) for clearance and to the
Regional Director for a decision.
g. Temporary
Appointments of 60 days or less (Staff Rule 030 and 1320)
i. This new type of appointment
introduced under contract reform is different from the temporary appointments
of less than six months under Staff Rule 420.4.
ii. This generally applies to GS categories, to meet
conference and short-term service e.g. ushers, messengers, guards, audio
technicians, typists etc. However, in
certain cases for specific professional skills, staff under professional
categories (both International and National) can also be appointed, such as
event organizers, journalists etc.
iii. Exceptionally, in the event of a natural disaster or
similar emergency situations, a temporary appointment of 60 days or less may
be issued pending full assessment of emergency needs in the longer term.
iv. WRs are authorized to
approve temporary appointment of 60 days or less.
h. Special Services
Agreements (SSAs)
i. WRs
are authorized to conclude SSA agreements locally
as per the new policy guidelines (IC-2008-28 refers). For purposes of
reporting to HQ on Malicious Act Insurance Policy (MAIP)
coverage, monthly status reports of serving SSAs
will however need to be sent electronically to PER/FSO/BFO
for information and follow-up.
i. Temporary Advisers
i. The term "temporary
adviser" applies to persons invited for short periods to provide advice
to the Regional Director. Temporary advisers are not considered as staff
members in any sense and receive neither appointment nor salary.
ii. For urgent assignments for a maximum of 3 weeks
duration, WRs are authorized to recruit Temporary
Advisers (keeping RD informed). This mechanism is to be used selectively for
urgent assignments only.
iii. Temporary Advisers could be brought in for such
short-term assignments on the basis of a Travel Authorization. In addition to
the per diem, Temporary Advisers could also be paid supplementary daily
allowance according to the approved ceiling (IC-2008-18 refers).
VI. HUMAN RESOURCES
(Entitlements)
a. Medical
Evacuation
i. RD's
approval is necessary for evacuation of WHO Country staff. Only under very exceptional circumstances,
where the medical status is imperative and serious (life threatening
emergencies), WR is authorized to issue a Travel
Authorization and medically evacuate the staff upon the recommendation of the
UN examining Physician or UN Dispensary Physician at the duty station. WR should, however inform this action to RSP/SEARO by telephone/ Fax/ email.
b. Rest and
Recuperation (R&R)
(Applies only to specific countries)
i. WRs
are authorized to approve R&R travel for
eligible staff under their supervision as per the R&R
policy applicable from time to time, provided there is at least a one month gap
between the return from R&R and the next.
ii. R&R travel can also be
combined with duty travel and annual leave as per the WHO Manual, whenever
this is convenient to the staff member concerned.
iii. Requests for R&R leave
for WRs should be referred to RD for approval. The
same conditions stated above will apply also to WRs.
VII. COORDINATION
WITH UN AGENCIES
i. WRs
are authorized to sign in-country agreements with UN agencies, using their
discretion, subject to the following conditions being met:
If the agreement:
is not legally binding;
does not commit WHO financially;
is not contrary to the Organization's policy,
strategy and direction, and
is just for the purpose of coordination and
cooperation.
ii. In case of any concern on the issue of what is legally
binding, WRs may raise these issues with DAF.
VIII. RESOURCE
MOBILIZATION
i. WRs
are authorized to accept voluntary contributions up to US$50,000 under a
standard exchange of letters (letter of acceptance) with the donor agency.
Beyond US$50,000, ERO/SEARO should be consulted
IX. PAYMENTS
a. APW/DFC/TSA
i. WRs
are authorized to make relevant payments for APW/DFC/TSA
signed under their delegated authority, including advances and installments
(when satisfied that the services have been rendered to the technical and
managerial satisfaction of the Organization, and the required reports
submitted accordingly).
b. On-Entry
Payments to TIPs
i. WRs
are authorized to effect payments of initial per diem to TIPs
(maximum of 30 days), if applicable, and advance salary payment up to one
month after reporting at the duty station in order to help the person getting
settled with housing and other initial expenses.
c. Payment of Per diem
i. WRs
are authorized to pay full per diem as applicable to participants and
Temporary Advisers attending WHO meetings, prior to their departure, with a
copy to BFO/SEARO for information.
X. ACCOUNTABILITY
Accountability goes hand in hand with delegation of
authority. Whenever staff are given responsibility for certain duties, they
should also be held accountable at the end for whether or not the results
were achieved as planned, and if not, why not.
Accordingly, in order to increase the degree of compliance
as well as to document the accountability, it is recommended that the
concerned technical staff completes
certain checklists at the planning stage, prior to routing the file to
the Administrative Officer for clearance and then for WR's
approval. Similar checklists should be
prepared at the completion stage also. The completed and signed checklists
should stay with the files, so that accountability also can be correctly
attributed later, in case of subsequent audit queries and review missions.
a. Planning stage
checklists
i. DFC (Annex-I) ii. APW and TSA contracts (Annex-II) iii. TIP recruitment (Annex-III)
iv. Local Procurement (Annex-IV) v. International Travel (Annex-V)
b. Completion stage
checklist
i. Completion stage checklist is attached as Annex-VI.
This is recommended for the completion stage of contracts, on which the
Professional Staff/NPO concerned should briefly
make their assessments.
1 August 2008 Samlee
Plianbangchang, M.D., Dr.PH.

|